GSA 8a STARS
 GSA Schedule 70
 IRS TIPSS-3
 Contacts
 Contract Benefits
 How to Use the Contract
 Task Area Services
 NAVSEA SeaPort-e
 Task Orders
 Technical Instructions
 Team Members
 Services Experience
 Customer Satisfaction
 Quality Assurance
 Point(s) of Contact
 NIH IW2nd
-
 Home > Federal Contracts > NAVSEA SeaPort-e
 

Services Experience

4 Prototyping, Pre-Production, Model-Making, and Fabrication Support (Zones 1 - 7)

4.1 AMSEC / SAIC (Zones 1, 4, 5)

Developed design drawings, including Ship Installation Drawings (SIDs) for installation of shipboard systems including prototype systems/equipment. Performed equipment functional analyses to determine failure/removal rates, part level essentialities, etc. (Level of analysis dependent upon complexity of each system/equipment addition and/or change).

4.2 LCE (Zones 1, 2, 3, 4, 6, 7)

Established a fuel nozzle development program with major fuel nozzle vendor that allowed for the continued improvement of fuel nozzles based on operational performance, failure modes and effects analysis and reverse engineering. This task included the engineering development of a new nozzle, and the manufacturing of a prototype, under LCE supervision, for testing. LCE developed and executed a test plan for the prototype nozzle, and based on the test results, assisted the vendor in the development of modifications

<<Back to Services and Experience

 
  Quick Links
-
-
-
-
-
  Case Studies
-
-
-
-
-
-